Amateur Extra › E1 Commission Rules › E1C07
E1C07
What notifications must be given before transmitting on the 630- or 2200-meter bands?
Pick an answer to check it.
Answer: D. Operators must inform the Utilities Technology Council (UTC) of their call sign and coordinates of the station
Before using 630 or 2200 meters, operators must notify the Utilities Technology Council (UTC) of their call sign and station coordinates. This helps protect power line carrier systems.
Tip: LF bands: tell the UTC first.
FCC rule reference: Part 97.303(g)